Sign In | Join Free | My himfr.com
Home > Circular Loom Machine >

6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S

    Buy cheap 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S from wholesalers
     
    Buy cheap 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S from wholesalers
    • Buy cheap 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S from wholesalers
    • Buy cheap 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S from wholesalers
    • Buy cheap 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S from wholesalers

    6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S

    Ask Lasest Price
    Brand Name : United Win
    Model Number : SBY-850X6S
    Price : USD
    Supply Ability : 8 sets/ month
    Delivery Time : 3 months
    Payment Terms : L/C, T/T
    • Product Details
    • Company Profile

    6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S

    Jumbo Ton Big Bag 6 Shuttle Circular Loom Weaving Machine


    Description:

    6-shuttle there are 6 shuttles installed with circular loom which able to weave simultaneously.
    1. Lead-out speed of weft of current high-speed circular loom has reaches at about 5m/s, only weft of good-quality can fit it. In general 4m/s suits widely, for the case of same folded diameter and woof speed, production rate of 12 shuttles is 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively.

    2.For fabrics, break of one weft thread means flaw, since it's difficult to avoid weft break completely, we have to reduce the affection of weft break, to increase shuttles is proven to be benefited , as follows:

    shuttle (piece)4681012
    loss of strength for break of one weft thread(%)2516.712.5108.3

    As such loss of strength for 12 shuttles will be less then 10% while one weft breaks.

    3. For same folded diameter, weaving speed and weft, time interval of weft change will be 2 times of 6 shuttles, 1.5 times of 8 shuttles and 1.2 time of 10 shuttles respectively, such that continuous running time of 12 shuttles will be longer than that of 6 shuttles,8 shuttles and 10 shuttles, if figured for 2-3 man operating two set of 12 shuttles circular loom, the efficiency and economy will be perfect.


    Specifications:

    No.sMouldShuttle Qty.(pcs)Max.fold width(mm)Max. Open width(mm)Warp no.s(pcs)Speed(RPM)Main power(KW)
    1UWCL-24/160002482001640080005~2537
    2UWCL-20/110002055001100053765~2822
    3UWCL-16/830016(12)4150830048005~4118.5
    4UWCL-12/780012(14)3900780044005~4118.5
    5UWCL-12/720012(14)3600720037805~4518.5
    6UWCL-12/6500123250650035205~5111/15
    7UWCL-12/600012(10)3050610032005~5111/15
    8UWCL-12/540012(10)2700540028805~6411/15
    9UWCL-10/480010(8)2600460027805~6411
    10UWCL-10/440010(8)2100450027405~727.5/11
    11UWCL-8/350081650360019965~807.5
    12UWCL-6/32006(8)1400300018205~807.5
    13UWCL-6/270061350270015105~1007.5

    FAQ:

    1. How long will your engineer reach our factory?

    Within one week after everything ready (machine arrival your factory, non-woven material, power source, air compressor etc. Prepared)


    2. How many days will you finish installing?

    We will finish installation and training within 15 days.


    3. What should we charge for your engineer?

    You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.


    4. Does your engineer understand English?
    Our engineers understand a little English. All our engineers have more than five years machine installation experience.


    5. How could you do if the parts broken within warranty?

    We would express the free replacement parts during the warranty date


    6. Can you help us find any engineer in our location?

    Of course, we will check and inform you as soon as possible.

    7. How do we solve the machine problem after your engineer leaving?

    Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time.Our engineers will take a solution video according your description.

    Quality 6 Shuttle Circular Loom Machine Ton Big Jumbo Bag Making Machine SBY-850X6S for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: CHANGZHOU UNITED WIN PACK CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)